APPLICATION AND CONSIDERATION OF PIPE-ROOF METHOD IN SHALLOW-BURIED MINED-TUNNEL PASSAGES
Keywords:
Pipe-roof method, Shallow-buried tunneling method, Metro passageAbstract
This paper investigates the application efficiency and key technical points of the pipe-roof method in shallow-buried tunnel-excavation passage projects. Taking the mined-tunnel passage for Exit No. IV of Fenghuang Xincun Station on Guangzhou Metro Line 8 as an engineering case, this study systematically reviews the whole implementation process of the pipe-roof method, covering design, construction and troubleshooting. Combined with literature review and field engineering practice, this paper documents typical construction problems including jacking difficulty, abnormal soil discharge and rock-stratum obstruction, and illustrates the countermeasures adopted, such as replacing large-tonnage jacks, optimizing drill-bit types, adjusting pipe-roof parameters and implementing reinforcement grouting. The results demonstrate that the pipe-roof method can effectively control ground surface settlement and deformation of surrounding structures. All monitoring data remained below warning thresholds, which guaranteed construction safety. It is concluded that the pipe-roof method delivers remarkable supporting performance and environmental-friendly advantages under complex geological conditions. Its successful application, however, relies on refined parameter design, dynamic construction adjustment and rigorous process control. The experience obtained provides important guidance for subsequent similar projects.References
[1] Wang Z L, Wang M N, Yan Z W, et al. Study on interaction mechanism between surrounding rock and support considering the effect of advance support. Tunnel Construction, 2021.
[2] Wang L L. Discussion on environmental protection effect of pipe-roof construction for shallow-buried tunnels. Value Engineering, 2019, 38(9): 105-107.
[3] Dai Z R, Hu R Q, Wang Z Y, et al. Mechanism and application of long pipe-shed support for mined tunnel in sandy-gravel stratum. Journal of Railway Engineering Society, 2024, 41(4): 68-74.
[4] Bai Q, Zhao W, Sun Y, et al. Pipe curtain deformation and surface subsidence caused via excavation of transverse pilot tunnel under pipe curtain support. Sustainability, 2023, 15(15): 11967. DOI: 10.3390/su151511967.
[5] Zhou G H. Application of large-diameter pipe-roof advance support in municipal tunnels. Railway Standard Design, 2016, 60(4): 68-71, 72.
[6] Yan G Y. Application of pipe-roof advance support in shallow-buried mined tunnel underneath expressway. Value Engineering, 2020, 39(12): 158-161.
[7] Wang S M. Application of pipe-roof support method in underground connecting passage construction. Building Construction, 2013, 35(2): 159-162.
[8] Li Q Y. Construction technology of advance pipe-shed support for shallow-buried tunnel section with weak surrounding rock. Transpo World (Late-month Issue), 2017(8): 108-109.